Control handshakes
Exercise the controller-to-equipment handoff off-line.
- Connect logic to the model
- Run transfer sequences
- Inspect signal mismatches

Test the controls before commissioning.
Connect control logic to a virtual plant, then exercise the difficult cases before they become on-site surprises.
Commissioning risk often lives between equipment, sensors, code, and people. Explore five cases that are difficult to provoke on a live line using the cards or arrows below.
Control handshakes
Sensor timing
Fault & recovery
Routes & recipes
Operator actions
Exercise the controller-to-equipment handoff off-line.
Test when sensor events arrive earlier, later, or together.
Create and repeat faults without risking a live line.
Follow each product through the right control path.
Practice the human decisions inside the sequence.

Explore all five challenges · Select a card or use the arrows
Emulation turns assumptions about controls and equipment behavior into repeatable tests before the real plant must carry them.
Run the control sequence against a responsive virtual plant before physical commissioning.
Trigger jams, missed signals, and restart sequences as often as needed.
See how conveyors, robots, sensors, and routing logic behave together.
Practice operator actions and recovery sequences in a safe off-line setting.
Document what was tested, what failed, and what still needs physical validation.
An emulation model + Repeatable test cases + Validation handoff
Exercise control logic against a virtual plant before physical commissioning. We define the interfaces and test cases that matter, including what still needs validation on site.
Explore our simulation project supportConnect agreed control interfaces to a responsive virtual plant and exercise transfers, concurrent arrivals, and error recovery. Repeatable tests help expose handshake and sequence issues before installation; findings are documented for the controls and commissioning teams.
Test selected recipe changes, routing logic, added equipment, and fault recovery against the virtual plant without intentionally provoking those cases on a running line. The scope defines what can be represented off-line and what must still be checked physically.
Use the emulation to rehearse selected operator actions and investigate logic issues before site work. We document tested cases, model assumptions, and remaining checks. Any commissioning-time benefit depends on the project's interfaces and fidelity; it is not a promised saving.
We select the control sequences and failure cases relevant to your commissioning decision. Interfaces and timing assumptions are defined with your controls team. A digital twin's connection to live data is scoped explicitly, not implied by a 3D model.
Typical inputs include equipment behavior, control sequences, PLC or soft-controller interfaces, signal lists, sensor timing, product routes, fault cases, and operator actions. We agree model fidelity and interface responsibilities before connecting systems.
Depending on scope, receive an emulation model, repeatable test cases, documented logic issues, and a validation handoff. Operator practice can be included where appropriate. Physical commissioning and on-site safety validation remain necessary.
With expert simulation consultation.
Tell us the equipment, control interface, and change you need to validate. We’ll define which cases can be tested off-line.